Beyond the Engineering Run:
FPD Installation and Commissioning
All of the castles should be installed and tested by March 1st, 2001. ?
All the tunnel electronics will be installed and cables will all be laid. ?
The dipole spectrometer will be instrumented with full detectors and phototubes. ?
The vertical spectrometers and one horizontal spectrometer will be instrumented with pseudodetectors (trigger scintillators only) to study halo. ?
Still looking for funds to purchased the phototubes for the other castles. ?
We hope to be ready to take data with a Phase I (10 pot) FPD in late summer. ?
Jan. 12, 2001 Commissioning meeting: