The status of the construction and installation of CMS detector is reviewed. The 4T magnet is cold since end of February 2006. Its commissioning up to the nominal field started in July 2006 allowing a Cosmic Challenge in which elements of the final detector are involved. All big mechanical pieces equipped with muons chambers have been assembled in the surface hall SX5. Since mid July the detector is closed with commissioned HCAL, two ECAL supermodules and representative elements of the silicon tracker. The trigger system as well as the DAQ are tested. After the achievement of the physics TDR, CMS is now ready for the promising signal hunting.